|
January 17, 2002
After much delay, procrastination, general foot dragging and basic laziness, I managed to muster the gumption to get busy on the studio. So far, I've installed one inch compressed foam insullation to the tongue and groove ceiling; built the south most section of the wall which divides the studio proper from the garage; and installed the first fourteen foot section of storage deck above the parking space.
|